INITIAL SITUATION
At the start of the project, Mynaric was using an S/4HANA
private cloud system in which mainly SAP standard
processes were mapped. The SAP system was to be
We supported
connected to the Manufacturing Execution System (MES)
Mynaric throughout the
Manufacturo.
connection of the MES to the
As part of the project requirements, numerous processes
S/4HANA system and
were to be outsourced from the SAP system and trans-
actively assisted in the transfer of
ferred to the MES. At this point, CONSILIO came into play
SAP processes to the MES.
via a customer recommendation.
Maxim Eirich, Consultant SAP SCM,
CHALLENGE
CONSILIO GmbH
One dif昀椀culty in connecting the MES to the S/4HANA
private cloud system was that several complex processes
had to be mapped in the MES especially when integrating
with the complex production structure of industrialized
laser communication terminal manufacturing.
BENEFITS OF THE SOLUTION
State-of-the-art SAP standard with CPI:
Standard MES systems did not cover enough processes
With SAP CPI, the latest technology was used for the
to meet Mynaric‘s requirements. An example of this is the
connection to the S/4HANA system. S/4HANA and the CPI
handling of inventory management in the MES and the
are cloud-hosted, so Mynaric bene昀椀ts from an end-to-end
carve-out of the EWM module from the SAP system that
standard via the cloud.
this requires.
Simpli昀椀ed monitoring also for non-interface experts:
MES updates continued throughout the project. For
The SAP standard offers monitoring functionalities, which
example, individual features, such as time con昀椀rmation
are supplemented by additional monitoring screens with
for individual operations in the production order, were
CPI.
available in the SAP system at the start of the project, but
not yet in the MES. For the transfer of information between
the systems, these had to be developed during the Cloud
Platform Integration (CPI) connection.
No use of the SAP solution PI/PO, whose support will be
discontinued as of 2027:
A later migration project can thus be avoided, the required
features of SAP PI/PO are successively implemented in
PROJECT GOAL
the CPI.
The aim of the project was to connect the MES with CPI to
Graphical interface for high usability:
the existing SAP S/4HANA system.
This connection was preceded by a design phase in which
processes for the individual modules were drawn, discussed and approved by Mynaric.
Examples are the PP module for production planning,
the subcontracting process, the delivery process and the
purchase order process.
The graphical interfaces enable the user to quickly understand and display complex scenarios.
Ability to access data sources across systems:
The data is transferred continuously between the SAP and
the MES system.
With the customized MES, Mynaric bene昀椀ts from a high
degree of 昀氀exibility regarding the mapped processes.
The system covers all the requirements that would have
Based on this, the connection of the processes from the
involved greater development effort if implemented in the
SAP system to the MES was planned, including the de昀椀-
SAP system.
nition of the business objects required for this purpose.